Solar Panel Installation in Trichy
Professional rooftop solar panel installation in Trichy by SVN Safetech — 500+ homes & businesses powered, PM Surya Ghar subsidy handled, 2–4 day install for most residential 1–5 kW systems.
What we do in the Solar sector
End-to-end solar EPC — design, supply, installation, subsidy paperwork, net-metering and O&M. Here's every service we offer:
On-grid Rooftop Solar →
Grid-tied systems 1–100 kW with net metering. Export surplus units to TANGEDCO. Best ROI, no batteries needed.
Off-grid Solar →
Fully independent solar + LiFePO4 battery bank for farms, borewells, remote sites with zero grid access.
Hybrid Solar →
Grid + battery combined. Runs essential loads during power cuts, exports surplus otherwise. Ideal for AC-heavy homes.
Solar Water Heaters →
100 LPD / 200 LPD / 300 LPD ETC & FPC systems for homes, hostels, hotels, hospitals.
Solar Street Lights →
All-in-one integrated LED street lights 20W–120W with lithium battery + motion sensor for panchayats & industries.
Solar Pump Systems →
1 HP to 25 HP AC/DC solar pumps with VFD under PM-KUSUM Component B (60% subsidy). Free application handling.
Commercial & MSME EPC →
10 kW–1 MW rooftop for factories, textile units, cold storage. 40% AD depreciation + demand-charge reduction design.
BESS (Battery Storage) →
Standalone or solar-integrated battery banks 50 kWh–1 MWh with EMS for peak shaving & backup.
Subsidy & Net Metering →
PM Surya Ghar, TN state top-up, PM-KUSUM, MNRE VGF paperwork + TANGEDCO liaison end-to-end.
AMC & Cleaning →
Panel cleaning (dry + water), IV curve testing, inverter firmware updates, HDD/battery health checks.
Sectors we serve
Indicative pricing (Trichy, 2026)
- 1 kW on-grid: ~₹70,000 → ₹40,000 after ₹30,000 subsidy
- 2 kW on-grid: ~₹1.3 lakh → ₹70,000 after ₹60,000 subsidy
- 3 kW on-grid: ~₹1.9 lakh → ₹1.12 lakh after ₹78,000 subsidy
- 5 kW on-grid: ~₹3.0 lakh → ₹2.22 lakh after ₹78,000 subsidy
- 10 kW commercial: ~₹5.6 lakh post 40% AD depreciation year 1
- 5 kW hybrid + 10 kWh LFP: ~₹4.5 lakh installed
Try the ROI calculator for an exact estimate based on your EB bill.
Brands we install
Solar Panels (DCR / Tier-1)
Waaree, Vikram Solar, Adani, Tata Power Solar, RenewSys — Mono PERC & N-type TOPCon bifacial.
Inverters
Deye, Sungrow, Growatt, Solis, Microtek — string, hybrid & off-grid variants with Wi-Fi monitoring.
Batteries (LiFePO4)
Pylontech Force H2, Livoltek, Exide LiFE, BYD Battery-Box — 10-year warranty, stackable modules.
Mounting & BOS
Galvanized MS structure (wind-load 150 km/h), Havells/Polycab DC cables, ABB/Havells breakers, Krypton earthing.
Our 6-step process
- Free site survey — roof measurement, shadow analysis, structural check, load profile study.
- Proposal + ROI report — system size, BOM, price, subsidy math, 25-year cash flow projection.
- Subsidy application — PM Surya Ghar / PM-KUSUM registration, document collection, DISCOM tie-up.
- Material delivery — DCR panels, inverter, structure delivered to site, verified against BOM.
- Installation & commissioning — 2–4 days on site, wiring, testing, inverter configuration.
- Net metering & handover — TANGEDCO inspection, meter installation, mobile app training, warranty docs.
What's included
- Free site survey & shadow analysis
- Tier-1 mono-PERC / TOPCon panels, 25-year linear warranty
- Branded inverter (Deye / Sungrow / Growatt) with 10-year warranty
- Wind-load tested galvanized MS mounting structure
- Net-metering & PM Surya Ghar subsidy paperwork
- Earthing, lightning arrester, ACDB/DCDB, MC4 connectors
- Mobile monitoring app setup (Wi-Fi / 4G)
- 1-year free service + AMC option
Why choose SVN Safetech
- 500+ installations across Trichy, Perambalur, Karur, Pudukkottai, Thanjavur, Madurai
- MNRE-registered vendor + TANGEDCO empanelled installer
- In-house design + electrical + civil team (no sub-contracting)
- Same-day site visit within Trichy city limits
- Tamil & English speaking engineers
- Post-install AMC with 48-hour SLA response
Frequently asked questions
How much does solar panel installation cost in Trichy?
A 3 kW residential on-grid system in Trichy costs about ₹1.9 lakh before subsidy. After the PM Surya Ghar ₹78,000 central subsidy + TN state top-up, net cost drops to around ₹1.12 lakh. Commercial 10 kW systems start at ₹5.6 lakh post-AD tax benefit.
How long does installation take?
For 1–5 kW residential systems, 2–4 days of on-site work after material delivery. Full timeline including subsidy application, TANGEDCO net-metering approval and commissioning is 30–45 days end-to-end.
What is the payback period in Tamil Nadu?
With the April 2026 TNEB tariff hike, residential 3 kW payback is now 3.8–4.2 years. Commercial 10 kW+ systems payback in 3.0–3.5 years after 40% accelerated depreciation.
Do you handle the PM Surya Ghar subsidy paperwork?
Yes — end-to-end. Application submission on the National Portal, DISCOM registration, inspection coordination, subsidy disbursal follow-up. Subsidy hits your bank account 30–60 days after commissioning.
What warranty do I get?
25-year linear performance warranty on panels (Waaree/Vikram/Adani), 10-year on inverter (Deye/Sungrow/Growatt extendable), 5-year workmanship warranty from SVN + 1-year free service AMC.
Will solar work during a TANGEDCO power cut?
On-grid only systems shut off during grid outage (safety mandate). Hybrid systems with LiFePO4 battery backup keep essential loads running. Off-grid systems work fully independent of the grid.
Book a free site survey today
Call +91 89734 24241, WhatsApp us or book a free site visit.